← turbo-rig.com
CHANGELOG

WHAT CHANGED, WHEN

Dated entries, each verifiable against a repo commit, a log, or a live page. This page covers the site and the public surface of the rig.

01Entries

2026-10-12 · The cognitive stack, named; the seventh organ started. New section on the homepage (EN + ES): the rig mapped as seven organs — fast thinking, deliberate thinking, memory, world model, self-monitoring, self-improvement, governance — six live, self-improvement in build. Lifetime gate stats published: 3,042 reviews, 73% REVISE (gate-log.jsonl, Oct 12, 2026), with the honest caveat that findings quality is not yet measured. The self-improvement roadmap: gate canary → test evidence in the gate record → labeled findings corpus in git → a local trainable classifier (helps the gate see, never vote) → a generated world model.

2026-10-09 · Evidence becomes quotable; wave-1 pages ship. /evidence gains a 56-word citable summary, a "how to cite" block, machine-readable data downloads (/evidence/2026-09-14.csv + .json) and a frozen permalink for the audited window. New pages: /how-it-works and /beta. The Spanish site lands at /es/.

2026-10-08 · Host consolidation and entity wiring. The duplicate turbo-rig.vercel.app host now 308-redirects every path to www.turbo-rig.com; the sitemap carries lastmod; the homepage links its entity graph (Turbo Flow, turboflow.online, Adventure Wave Labs, Adventure on the Wave, Marcus Patman).

2026-10-07 · The evidence dossier goes public. /evidence publishes the audited week as a page: claim tables, ten arithmetic identities, the corrections the audit caught, reproduction commands, certification hashes.

2026-09-25 · First public product page. turbo-rig.com opens with the rig's definition, the FAQ, robots/llms.txt welcoming answer engines, and the beta-request funnel.

2026-09-21 · The audited week ends; numbers challenged and re-derived. The owner challenged the published stats; a same-day audit re-derived every number from the primary logs, caught three wrong values, corrected the pages the same day. The corrected record is what /evidence now publishes.

2026-09-16 · The gate goes live. The cross-model review gate (review.sh) starts issuing fail-closed APPROVED/REVISE verdicts in the rig; its log is the primary source behind every public number since.

2026-09-09 · The rig is built. Triangle + Spine + Loop in one repo: three agents with distinct jobs, one constitution, one git-versioned memory, human-only merges. Successor to Turbo Flow.

02How this changelog is kept

Every entry names a date you can check: site entries against repo commits and live URLs, rig entries against the evidence dossier and the public repos. Entries are added, never silently rewritten; if something here contradicts the dossier, the dossier wins and this page gets a correction.